Management team reviewing documentation
  1. Home
  2. Certification
  3. The application is the first audit.

The application is the first audit.

Scope, sites, headcount, shifts, processes and outsourcing determine audit time and the audit programme. An application that understates any of them produces a programme that fails at Stage 1, so we ask for the real numbers here.

The organisation
Exactly as it would appear on the certificate.This field is required
This field is required
This field is required
Describe what the organisation actually does, not a generic category.This field is required
What you are requesting
This field is required
This field is required
The wording you want on the certificate. It is reviewed for accuracy and for what it implies.This field is required
What determines audit time

These numbers determine the audit programme. Inaccurate figures are found at Stage 1 and the calculation is redone.

This field is required
This field is required
This field is required
This field is required
Declaring this changes the route; it does not prevent acceptance.This field is required
This field is required
Impartiality
Naming the preparer lets the self-review threat be assessed before acceptance rather than after. A certification body does not certify a system it designed.This field is required
Contact
This field is required
This field is required
This field is required
This field is required
This field is required
This confirmation is required
Supporting evidence
Accepted: PDF, Excel, CSV, Word, ZIP, images. Maximum 25 MB per file. Do not attach personal data the request does not require.
    A file exceeds the permitted size.

    The contracting entity

    This application is addressed to Global Energy Up, which delivers management-system certification services and owns the audit programme, the technical review, the certification decision and the certificate register.

    What submitting does not do. It creates no contract, reserves no audit date, and does not oblige the body to accept. The application review may end in refusal where the scope falls outside competence or where an impartiality threat cannot be treated.

    Privacy

    Nothing entered in this form is sent to analytics. Only anonymous usage events (form started, form submitted) are recorded, with no field content. Privacy policy

    What happens next

    Four steps, and what each one needs from you.

    1. Application review. Global Energy Up confirms it has competence for the standard, sector and geography requested, and identifies any impartiality issue — including whether any part of the group has provided consultancy on this system.

    2. Audit time and proposal. Determined from the declared scope, sites, headcount, shifts and risk. Where the declaration and reality diverge, audit time is recalculated and the proposal changes.

    3. Contract and programme. Scope wording is agreed in the exact form it would appear on a certificate, and an audit team with no conflict of interest is appointed.

    4. Stage 1. Readiness is examined against what was declared here. Anything material that was not declared is raised at this point rather than after Stage 2.

    Describe the claim — not the service.

    Tell us what must be relied on, who will rely on it and by what date. We will confirm the correct programme, evidence requirement and responsible entity — or tell you it is outside our scope.